Supply, Delivery and Installation of Energy Monitoring System (EMS) Software, Monitoring System, and Accessories at Tribhuvan International Airport Civil Aviation Office (TIACAO)

Supply, delivery, and installation of an EMS software and monitoring system at TIACAO, Gauchar, for real-time energy data management and power quality monitoring.

ClientTribhuvan International Airport Civil Aviation Office (TIACAO)
LocationGauchar, Kathmandu, Nepal
CompletedMay 2025
Duration10 months and 17 days

Project Overview

Overview

This project was carried out for the Civil Aviation Authority of Nepal (CAAN) at the Tribhuvan International Airport Civil Aviation Office (TIACAO) in Gauchar, Kathmandu. It covered the supply, delivery, and installation of an Energy Monitoring System (EMS), comprising EMS software, monitoring hardware, and associated accessories, to enable real-time monitoring of power systems and power quality within the airport's electrical infrastructure. The project reference number was SF-80-2869, and it was completed on 22 May 2025 after a duration of 10 months and 17 days.

Scope & Deliverables

  • Supply and delivery of EMS software and monitoring systems capable of tracking 125+ devices, including a server PC, PLC, software license, and server rack.
  • Installation of Energy and Power Quality Meters (2 sets for HT panels) and Wireless Energy Sensors (10 units for main panels and 10 smart sensors for auxiliary panels).
  • Delivery and installation of Thermal Monitoring Wireless Sensors, 55-inch UHD display monitors, quad monitor stands, and 4 TR cassette air conditioner units (LG/Daikin or equivalent).
  • Supply and installation of fire-rated metal doors (120-minute certified) meeting BS-476 and IS:3614 standards.
  • Provision of accessories for the EMS installation, including networking cables, cable termination kits, MCCBs, cable trays, and fittings.
  • Integration, configuration, and commissioning of all EMS components in compliance with ISO 50001, ISO 50002, ISO 50006, IEC 62443, and IEEE standards.

Outcome

The Energy Monitoring System was tested, and training was provided to TIACAO personnel before handover of the fully functional system. TIACAO now has centralized, real-time monitoring of energy consumption and power quality across the installed panels and monitored devices.

Project Highlights

Gallery image 1
Gallery image 2
Gallery image 3
Gallery image 4
Gallery image 5
Gallery image 6
Gallery image 7
Gallery image 8